engineering case

Cases

Commercial vehicle assembly three-line project

Used for chassis assembly, a total of 15 workstations from longitudinal beam subassembly to chassis assembly offline, including overhead steel structures and ground production equipment. The core process is the RGV general assembly trolley, which uses a track-type assembly trolley to meet the needs of online assembly while ensuring chassis assembly accuracy.